salam
Algeria Oran Fertilizer Project / Building Mechanical Work
Building Capacity:
Floor Area (57,853m2), 1st or 2nd Floor
Duration:
July.01.2009 ~ Dec.31.2011
El-Djazaria El-Omania Lil Asmida Apa (Owner)
Daewoo E&C (Client)
Work Performed:
HVAC & Duct System, Fire Fighting System
Plumbing System, GAS System, BMCS & TAB
Algeria Oran Fertilizer Project / Building Mechanical Work
Building Capacity:
Floor Area (57,853m2), 1st or 2nd Floor
Duration:
July.01.2009 ~ Dec.31.2011
El-Djazaria El-Omania Lil Asmida Apa (Owner)
Daewoo E&C (Client)
Work Performed:
HVAC & Duct System, Fire Fighting System
Plumbing System, GAS System, BMCS & TAB
Commentaire